Did you finish the shutdown clean?
Does the mining résumé still read like ordinary day work?
Did the outage take nights, permits, and handover, and page one still says operator duties?
That’s the pain
This happens a lot on Australian mining, FIFO, plant, and trades files. Shutdown, outage, and major turnaround work is the strongest proof you have. The scope. The urgency. The permits. The night shifts. The contractors. The handover. The file buries it under duties, a ticket list, or “assisted with shutdown.” A site recruiter sees another generic operator or trade CV.
Not the tickets. Not the day-work list. The file still hides the outage you finished.
A score will not fix it
A free ATS score will not put the shutdown on page 1. It will not write a specialised mining résumé for FIFO, plant, or trades.
If you want the score, use the free ATS score.
How we fix it
Send the résumé and the job you want. We write the shutdown you actually finished. AI can list tickets. A human desk puts the outage on the page.
That is human résumé writing, not a tidy score. If you want a person on it, send it for a free résumé review. Pricing is there if you already know you want it written. The résumé writing page is that work.





